Design and construction of a modular access and protection scaffold measuring 220m x 80m to facilitate a new transition roof for the station. The structure was erected off existing runway beams to enable movement of materials and equipment. To reduce the risk of working at height, all modular panels were constructed at ground level, craned into position and secured by personnel working from Mobile Elevated Working Platforms.